Rubber CZPT Belt Vulcanizing Equipment
one.Product edge:
Substantial speed open/shut mould, large manufacturing performance, protect mould.
Adopt new sealing content, superb seal and extended existence.
Matching avanced oil way, decrease vitality intake.
Its composition is simpleand software is vast. It is effortless to be operated.
Variety | XLB-D(Y)350× 350× 2 | XLB-D(Y)400× 400× two | XLB-D(Y)500× 500× two |
MN Nominal mounding power | .twenty five | .five | .6 .eight |
Working layer number | two | 2 | two |
mm Piston stoke | 250 | 250 | 250 |
Mpa plate pressure | two.04 | 3.thirteen | three.two |
KW Main moter electricity | one.5 | two.2 | 2.2 |
mm plate chearanle | one hundred twenty five-two hundred | a hundred twenty five-two hundred | a hundred twenty five-200 |
Calefaction fashion | CZPTity, (oil) steam | CZPTity, (oil) steam | CZPTity, (oil) steam |
Configuration | Column type, frame kind | Column sort, body sort | Column kind, body type |
CZPT heating pipe’ s heating electricity (each heating layer) KW (only to the sort of heating) | one.eight | two.seven | 3. |
2.Scope of application
This device is normally adopted column and body sort.
It largely utilised to create a variety of rubber items, this kind of as rubber belt, Yoga mat,sound tire, shoe sole, rubber tile, and so on.
FAQ-Problems of buyer concern:
About device efficiency high quality
one. Q: How to ensure the high quality of outsourcing areas?
A: Initial option much more than 2 suppler by tender, There are rigorous program and procedure for inspecting outsourcing parts. And there are outsourcing inspectors, following inspection, experienced goods, labeling and storage. Not certified, return.
2. Q: Which brand of electric portion?
A: Use globe famous brands, Siemens, Omron, Toshiba, Schneider, ABB
CZPTer can specify the brand.
three. Q: Which PLC?
A: Siemens, Omron, Mitsubishi
four. Q: How to manage the high quality?
A: There are inspectors for inspecting products good quality and efficiency, after assembly, device operate continually for at least 12 hours at a single time, Complete operating time must be not much less than forty eight hours.
About installation
one. Q: When the information engineer arrive at customer’s manufacturing facility?
A: If require installation on internet site, engineer will get there at manufacturing unit within 1 week after machine arrived at factory.
About following-income services
one. Q: What is the warranty time?
A: 2 years soon after device arrived at factory
2. Q: How to solve the problem?
A: In a single hour right after getting customer’ difficulty, notify the resolution way, there are three methods for distinct circumstances. one, Which can be solved by telephone or Email, it will be solved in two several hours. 2. Which can be solved by Remote Control, it will be solved inside of four hours(device is equipped by Distant Network Handle Issue). 3. Which want resolve it on site, engineer arrive at factory inside of a single week(in the two many years warranty day, engineer has the visa any time of the country exactly where the device.