Welcome to HangCZPT Beidou CZPT Functions CZPT Co&comma ltd
CZPT item high quality&comma aggressive cost assure minimal marketplace&comma Welcome associates to program to examine&comma examine in construction developing lifting gear&comma business negotiations&comma and sample processing&comma in buy to have a wonderful foreseeable future and a harmonious ralationship&time period
Merchandise Details
A&period Producing approach&colon Rigorous substance selection— Blanking— Inspection — Welding— Inspection— Blasting — Inspection — Baking completed or galvanized— Inspection — Completed product
Out of doors developing elevator can be CZPT according to customers’requirements &lpardrawing&comma specs and so on&rpar&time period
B&period Specific design and style for Cage&colon
one&time period Base and roof of Cage undertake trapezoidal body
2&period of time Bottom and the roof are complete symmetry
three&time period The airplane of symmetry are connected by Bending plate&comma Bending channel and square pipe which make it firm&comma straight and equilibrium in use&period
4&interval The wall close to cage can be set by Punched Aluminium plate&comma Punched zinc plate&comma steel wire mesh&period
5&interval Surface area Treatment method&colon Blasting&comma Baking completed&comma Galvanized
C&period Workshop Particulars and Transportation Particulars&colon
1&time period All Production Line adopt standard of the fixture&comma mould&comma gauge
2&period of time Each and every CZPT Elevate need to be testing-run and adjustment in Manufacturing facility
three&time period Workshop 5S mangement type
D&colon About us
We are a skilled development hoist manufacturer&comma and we can make professional designing&comma creating&comma marketing and advertising&comma repairing and maintaining a coordinated approach&time period
Quality is existence of enterprise&comma detail tends to make big difference&period of time We have a standard procedure and stict check out on each and every method&period of time
We would like to cooperate with all colleagues sincerely and creat a brilliance future with each other&time period
Attribute | Model | Rated Loading | Lifting Speed | Motor Power |
CZPT cabin |
SC200/200 | 2 × 2000kg | 33m/min | 2 × (three × 11kw) |
SC150/one hundred fifty | 2 × 1500kg | 33m/min | two × (2 × 15kw) | |
SC100/one hundred | 2 × 1000kg | 33m/min | two × (2 × 11kw) | |
Single cabin |
SC200 | 2000kg | 33m/min | 3 × 11kw |
SC150 | 1500kg | 33m/min | 2 × 15kw | |
SC100 | 1000kg | 33m/min | 2 × 11kw |
2. Personnel and materials out of doors constructing elevator with Interver:
Characteristics | Design | Rated Loading | Lifting Speed | Motor Power | |
CZPT Cabin |
Minimal-speed |
SC200/200D | 2 × 2000kg | -36m/min | two × (three × 11kw) |
SC100/100D | 2 × 1000kg | -36m/min | two × (two × 11kw) | ||
Mid-pace |
SC200/200Z | 2 × 2000kg | -60m/min | 2 × (two × 11kw) | |
SC100/100Z | 2 × 1000kg | -60m/min | 2 × (2 × 11kw) | ||
Single Cabin |
Lower-speed |
SC200D | 2000kg | -36m/min | three × 11kw |
SC100D | 1000kg | -36m/min | 2 × 11kw | ||
Mid-pace |
SC200Z | 2000kg | -60m/min | two × 11kw | |
SC100Z | 1000kg | -60m/min | 2 × 11kw |