Transmission  made in China - replacement parts -  in Salem India  Chain 60-1 for Roller Conveyor Technique with ce certificate prime good quality lower price tag

We – EPG Team the bigge EPT Chain and agricultural gearbox manufacturing unit in China with 5 diverse branches. For a lot more information: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828

OUR Products Record:
A and B sequence single/double/triple standard roller chain and no-normal roller chain

DIN/ISO ANSI Pitch Roller Width Pin Pin Lnner Plate Supreme Average bodyweight
KIN/ISO ANSL     between diameter length plate thick tensile tensile for each
Chain Chain     inner plates       depth -ness strength strength meter
No. No. P d1 b1 d2 L Lc h2 T Q Q0 q
    max min max max max max max min
    mm mm mm mm mm mm mm mm kN/LB kN kg/m
*03C *fifteen four.7625 two.forty eight two.38 one.62 6.1 6.9 four.three .six one.80/409 2 .08
*04C-one *twenty five 6.35 three.3 three.eighteen 2.31 seven.nine eight.four 6 .8 three.50/795 four.6 .15
*06C-one *35 9.525 5.08 four.77 3.58 twelve.4 13.17 nine one.3 seven.90/1795 10.eight .33
085-one 41 twelve.7 7.seventy seven 6.twenty five three.58 thirteen.seventy five 15 nine.ninety one 1.three 6.sixty seven/1516 twelve.six .41
08A-1 40 12.seven seven.95 seven.eighty five 3.ninety six sixteen.six seventeen.8 twelve one.5 14.ten/3205 17.five .62
10A-1 50 fifteen.875 10.sixteen 9.4 five.08 twenty.7 22.two 15.09 two.03 22.20/5045 29.four one.02
12A-one 60 19.05 11.91 twelve.57 five.94 25.9 27.7 eighteen two.42 31.eighty/7227 forty one.five 1.5
16A-1 eighty 25.four 15.88 15.seventy five seven.ninety two 32.seven 35 24 three.25 fifty nine.70/12886 69.four two.six
20A-1 100 31.seventy five 19.05 eighteen.nine nine.fifty three forty.4 forty four.7 thirty 4 88.fifty/20114 109.2 3.ninety one
24A-1 a hundred and twenty 38.1 22.23 25.22 11.one fifty.three fifty four.3 35.7 four.eight 127.00/28864 156.3 five.sixty two
28A-one 140 44.forty five twenty five.4 twenty five.22 twelve.7 54.4 fifty nine 41 five.six 172.forty/39182 212 7.five
32A-one one hundred sixty 50.eight 28.fifty eight 31.55 fourteen.27 64.8 69.six 47.8 six.four 226.80/51545 278.9 1.1
36A-1 a hundred and eighty 57.15 35.seventy one 35.forty eight seventeen.46 seventy two.8 seventy eight.six fifty three.6 7.2 280.twenty/63682 341.8 13.forty five
40A-1 200 63.five 39.sixty eight 37.85 19.eighty five eighty.three 87.2 sixty eight 353.80/80409 431.6 16.15
48A-1 240 76.2 forty seven.sixty three 47.35 23.eighty one ninety.5 103 72.39 9.five fifty one.thirty/115977 622.5 23.2

 

 DIN/ISO Pitch Roller Width Pin Pin Lnner Plate Greatest Average bodyweight
KIN/ISO     in between diameter length plate thick tensile tensile per
Chain     inner plates       depth -ness strength strength meter
No. P d1 b1 d2 L Lc h2 T Q Q0 q
  max min max max max max max min
  mm mm mm mm mm mm mm mm kN/LB kN kg/m
04B-1 6 4 two.eight one.85 six.8 7.8 five .six 3.2/682 three.2 .eleven
05B-1 8 five three 2.31 8.two eight.9 7.1 .8 five./1136 five.nine .two
*06B-1 nine.525 6.35 five.72 3.28 13.fifteen 14.one 8.2 one.three nine./2045 ten.4 .41
08B-1 12.7 eight.51 seven.75 4.45 16.seven eighteen.2 eleven.8 one.6 eighteen./4091 19.4 .sixty nine
10B-one fifteen.875 ten.16 nine.65 five.08 19.5 20.9 fourteen.7 1.seven 22.4/5091 27.5 .93
12B-1 19.05 12.07 11.sixty eight five.seventy two 22.five 24.2 16 one.85 29./6591 32.two one.fifteen
16B-1 twenty five.four fifteen.88 17.02 eight.28 36.one 37.4 21 four.fifteen/3.1 60./13636 72.8 2.71
20B-one 31.75 19.05 19.56 ten.19 41.3 45 26.4 4.5/3.5 95./21591 106.seven 3.seven
24B-1 38.1 twenty five.4 25.four fourteen.sixty three fifty three.4 fifty seven.8 33.2 6./4.8 a hundred and sixty./36364 178 seven.1
28B-1 44.45 27.94 thirty.99 fifteen.nine 65.one 69.5 36.7 seven.5/6. 200./45455 222 8.five
32B-1 fifty.eight 29.21 thirty.ninety nine 17.81 66 71 42 7./6. 250./56818 277.five ten.twenty five
40B-one 63.5 39.37 38.one 22.89 eighty two.2 89.two 52.ninety six 8.5/8. 355./80682 394 16.35
48B-one seventy six.two forty eight.26 45.72 29.24 99.1 107 63.8   560./127272 621.six 25

Products display
 
 

  
  

    

Our workshop

  

Our hot remedy products
    
 

   FAQ

Q1. What is your phrases of packing?
A: Normally, we pack our merchandise in single color box. If you have unique reque EPT about packing, p EPT negotiate with us in advance, we can pack the items as your request.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before supply. We’ll present you the photographs of the products and packages 
prior to you shell out the harmony. EPT payments terms, p EPT negotiate with us in advance, we can talk about.

Q3. What is your terms of shipping?
A: EXW, FOB, CFR, CIF.

This autumn. How about your shipping time?
A: Typically, it will take 25 to 30 times right after obtaining your advance payment. The certain shipping and delivery time depends 
on the products and the amount of your order.

Q5. Can you generate in accordance to the samples?
A: Indeed, we can generate by your samples or complex drawings. We can build the molds and fixtures.

Q6. What is your sample plan?
A: We can supply the sample if we have prepared areas in stock, but the buyers have to pay out the sample co EPT and 
the courier expense.We welcome sample purchase.

Q7. Do you te EPT all your items ahead of supply?
A: Of course, we have 100% te EPT before supply

Q8: How do you make our organization lengthy-term and good romantic relationship?
one. We keep great good quality and aggressive price to ensure our clients gain
2. We respect each and every consumer as our pal and we sincerely do enterprise and make pals with them, 
no subject the place they occur from.

 

The use of first tools manufacturer’s (OEM) portion quantities or emblems , e.g. CASE® and John Deere® are for reference purposes only and for indicating solution use and compatibility. Our firm and the detailed substitution areas contained herein are not sponsored, accepted, or produced by the OEM.

Transmission  made in China - replacement parts -  in Salem India  Chain 60-1 for Roller Conveyor Technique with ce certificate leading high quality reduced value

Transmission  made in China - replacement parts -  in Salem India  Chain 60-1 for Roller Conveyor Program with ce certificate leading high quality reduced price tag

Transmission  made in China - replacement parts -  in Salem India  Chain 60-1 for Roller Conveyor System with ce certification prime high quality minimal price