We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing facility in China with 5 various branches. For much more specifics: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
EPT Electric powered EPT Diesel Anchor Windlass
one.Double drum hydraulic windlass intro
EPT anchor windlass is a equipment that restrains and manipulates the anchor chain and/or rope on a boat, permitting the anchor to be elevated and lowered. A notched wheel engages the links of the chain or the rope. A “trawl windlass” is a related machine that restrains or manipulates the trawl on a commercial fishing vessel. The trawl is a form of big fishing internet that is wound on the windlass. The fishermen possibly allow-out the trawl or heaves-up the trawl throughout fishing functions. A brake is provided for manage and a windlass is typically run by an electric or hydraulic motor running through a equipment prepare
Windlass can be divided into horizontal windlass and vertical windlass according to arrangement.The horizontal windlass is widely utilised in modern transportation ships.For the convenience of mooring and unmooring operation and adjusting the drive of cable, contemporary ships usually undertake the mixture of anchor and mooring winch, which combines the anchor winch and mooring winch.In addition to the auxiliary reel at the conclude of the spindle, a mooring winch (primary reel) is presented on the windlass spindle, which, like the sprocket wheel, is pushed by the spindle and managed by a separate clutch and brake.Close the clutch and twi EPT or loosen the rope.After the cable is tightened, the brake is tightened to sustain the tension state of the cable with out getting moved to the bollard.
two. EPT anchor windlass main parameters
Model | Dian of chain wheel(mm) | Working load(kn) | Overhead pulling power(kn) | Holding load(kn) | Nominal velocity(m/min) | Warping load(kn) | |||
AM2 | AM3 | AM2 | AM3 | AM2 | AM3 | ||||
seventeen.5 | seventeen.five | thirteen | 14.six | 19.5 | 21.nine | eighty | one hundred fifteen | 9 | eight |
19 | 19 | fifteen.three | seventeen.two | 23. | 25.eight | 95 | 135 | 9 | 10 |
twenty | 20 | seventeen.9 | twenty. | 26.nine | thirty. | one hundred ten | 157 | nine | 10 |
22 | 22 | 20.six | 23. | 30.9 | 34.5 | 126 | one hundred eighty | 9 | fifteen |
24 | 24 | 24.five | 24.4 | 36.8 | 41.one | 149 | 214 | 9 | twenty |
26 | 26 | 28.seven | 32.one | 43.1 | forty eight.2 | one hundred seventy five | one hundred fifty | 9 | 20 |
28 | 28 | 33.3 | 37.two | fifty. | 55.8 | 202 | 289 | 9 | twenty |
thirty | 30 | 38.three | forty two.eight | 57.5 | sixty four.two | 231 | 330 | 9 | thirty |
32 | 32 | forty three.5 | 48.6 | sixty five.three | seventy two.9 | 261 | 374 | 9 | 30 |
34 | 34 | forty nine.one | 54.nine | 73.seven | 82.4 | 294 | 421 | nine | thirty |
36 | 36 | 55.1 | sixty one.6 | eighty two.seven | ninety two.4 | 329 | 470 | nine | 30 |
38 | 38 | 61.four | 68.nine | 92.1 | 103.4 | 365 | 522 | 9 | forty |
40 | forty | sixty eight | 76. | 102. | 114. | 402 | 576 | 9 | forty |
Usually, the set up of the windlass should ensure that the a few details of the anchor chain top out (the anchor chain barrel, the chain controller and the sprocket) are in 1 line
Work load: refers to the rigidity measured at the outlet of the anchor chain wheel.
Overload pressure: the short time overload capacity essential by the windlass.
Typical velocity: the velocity at which two anchor chains are recovered when a few are in the h2o and are freely suspended.
Assist load: refers to the maximum static load on the anchor chain that the anchor chain wheel brake need to be ready to bear.
three.anchor windlass shipping photographs
4.In purchase to deliver you a mo EPT suitble model we require validate the subsequent information.
one), what is the winch pulling capacity?
two),what is the winch wire rope size?
three),what is the wire rope diameters?
4)You need the winch with single or double drum?and per drum pulling capacity?
five),what is the winch working environment?
six),Are you need to have electricity pack?
FAQ
1. What kind of right after-sale solutions will you source?
One 12 months warranty.
Providing cost-free fast-use element.
Lower charge for keep on routine maintenance when warranty is expired.
Unique engineer assistance at any time.
We can supply free instruction to finish-users.
2. Can you make tailored products?
Indeed, of program. You can ship your workshop photos or drawings, or ju EPT tel: +86~thirteen 0571 88828l us your special requires,
our engineers can make appropriate design and style for you
three. Can you e-book the boat for me, as we do not have our possess forwarder?
Sure, we have our very own forwarder, and we had cooperated with the forwarder more than 5 a long time
four. Can you supply the high quality certification?
Of course, all types of certification are obtainable, if you have doubt, you can arrive to our manufacturing unit and te EPT it by yourself,
or you can let some 3rd-partied to do the inspection for you.
five. How can I install the crane?
Our engineers can come to your operate website to information the set up.
6. Can I have a visit to your manufacturing unit?
You can appear to our manufacturing facility anytime when you are hassle-free. We will make arrangement to choose you up.
six.If you have passions, p EPT make contact with me freely.
We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears factory in China with 5 various branches. For more specifics: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of unique tools manufacturer’s (OEM) part figures or emblems , e.g. CASE® and John Deere® are for reference purposes only and for indicating merchandise use and compatibility. Our organization and the shown substitute components contained herein are not sponsored, accredited, or created by the OEM.